
Running out of inclination, or not inclined at all. The unread blog must be an untended blog. Without activity, there is no story, without response there is no dialogue, and without dialogue there is no point. Is there?
This picture is me working at 5.2m above the ground! I'm priming the boards before the weather gets to them, and before we decide that the eaves boards (behind my head) all need to be replaced.
It's over a month since the last post and several things have slowed me down on the renovation trail:
- Applying for office ('real') jobs (on the hot days mainly).
- Unsuitable weather for the job (too hot mainly).
- Fiddling with fridges and freezers inside (new purchases).
- Being at Port Fairy Music Festival (I suppose we did need a holiday).
- Feeling crook (or was it just feeling lazy?).
- Finding stuff that needed more repairs (like the NW corner at the roofline).
Enough of these excuses! To get this done soon is becoming a pressing issue, as funds start to dry up and we approach wetter weather in April. One last excuse (break) is that I'm off to my brother's wedding next week - so that'll be some more (9) days off.
I've got to finish the prep/patching before I go on my little jaunt. Then Lynne can do some filling and painting while I'm away. She seems to get on with things more quickly when I'm not here.